冷彎薄壁型鋼體系案例《FIFA 2014 媒體中心》

 朱明之關(guān)于建筑 2020-10-29

城市建設(shè)類項(xiàng)目可參考


FIFA World Cup Media Centre

Brazil’s Gypsteel and New Zealand’s FRAMECAD were at the centre of worldwide media attention at the 2014 FIFA World Cup, having created a state-of-the-art communications hub in record time under extremely challenging conditions.

Innovative Partition System 

Because the IBC had to be created within an existing event stadium and no permanent fixtures could be attached to the existing structure, 

這個(gè)項(xiàng)目建設(shè)在一個(gè)既有的體育館內(nèi),同既有結(jié)構(gòu)沒有任何拉結(jié)固定

Gypsteel and FRAMECAD collaborated to design and produce a bespoke demountable partition system.  The partition system was comprised of structural steel framing and orientated strand board (OSB), a material which provided the necessary impact resistance and is reusable. 

只用了輕鋼和OSB板

FIFA Chooses Sustainable Quality 

FIFA wanted a solution which was environmentally sustainable, strong and could be produced within a short on-site construction period, so structural cold form steel framing had a distinct advantage from the outset.

“We were awarded the project following a design competition by FIFA. They chose the best technical solution regarding the speed and quality of product,” says the Gypsteel project manger. 
“It was a long journey, which included offering different options and approaches to the FIFA Architectural and Engineering Committee to achieve a technical solution, and then fabricating and erecting a prototype for final FIFA approval.”

The project was awarded the “Green Project” award by FIFA, an award that recognized that using sustainable products like steel and the reusable aspect of the demountable partition system contributed to the overall sustainability of the FIFA World Cup 2014.  Our project was recognised as one of the best projects in terms of cost, quality, delivery, schedule, and minimum waste,” says the  Gypsteel project manager. 


A Fast, Flexible System

The biggest challenge was to build freestanding structures without anchoring or attaching them to the floor or ceiling in any way. 

The flexibility of the cold form FRAMECAD System meant that Gypsteel were able to create structures including walls up to 9 meters tall, walkways, bridges and cable tray support. The designs also included partially exposed structural steel framing, which allowed for a atheistically pleasing design elements that fitted well with the existing building. 

2014-2016,世界杯和奧運(yùn)會兩大體育賽事,讓巴西迎來一個(gè)建設(shè)高潮,下面的視頻是一個(gè)縮影